| Part No. : CK-104 LONG LEAD | Alternate P/N : CK104LONGLEAD | Manufacturer : crl components inc |
| Item Name: capacitor fixed ceramic dielectr | NSN: 5910-00-113-5499 (5910001135499) | CAGE Code: 71590 |
| FSC: 5910 Capacitors |
If you require part number CK-104 LONG LEAD from Crl Components Inc which is described as a Capacitor Fixed Ceramic Dielectr component ASAP Logistic Solutions is your sourcing solution. On this page, you can request a quote on part number CK-104 LONG LEAD which is listed under the Federal Supply Class 5910 Capacitors. To ensure that you only procure the exact item you need to be sure to note that this particular product is listed with the NSN 5910001135499 and was produced under the CAGE Code 71590. To learn more about this listing or to simply initiate the purchasing process, complete and submit the RFQ form on this page for part CK-104 LONG LEAD today Within 15 minutes of receiving and reviewing a completed request based on the information you provide a member of our staff will contact you to provide a tailored solution to your comparison needs.
| NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
|---|---|---|---|---|---|---|
| 5910-00-113-5499 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 001135499 | 0 | P | A | |
| CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
| U | A | A | 0 | |||
| Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
| 833013-0001 | 3 | 1 | C | A |
| MRC | Criteria | Characteristic |
|---|---|---|
| AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL S) ON ONE SURFACE |
| AARG | RELIABILITY INDICATOR | ESTABLISHED |
| AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
| ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
| ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
| ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
| ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
| AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
| AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
| AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE S) |
| AGAV | END ITEM IDENTIFICATION | MULTIPLE LAUNCH ROCKET SYSTEM MLRS) |
| CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
| CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
| CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0 TO 15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
| CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
| CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
| CRTP | TOLERANCE RANGE PER SECTION | -10.00 TO 10.00 PERCENT SINGLE SECTION |
| CWJK | CASE MATERIAL | PLASTIC |
| CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
| CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
| CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
| NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
| TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION INCLUDES ENGINEERING TYPE BULLETINS,BROCHURES,ETC.,THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT EXCLUDES COMMERCIAL CATALOGS,INDUSTRY DIRECTORIES,AND SIMILAR TRADE PUBLICATIONS,REFLECTI |
| TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
| ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
If you have more than one item, you can also send us your part number list (Spreadsheet) by uploading your list here.
Upload